We apply predictive cost modeling and zero-assumption document analysis to produce a line-item budget, risk map, and ready-to-bid scope. You start execution with certainty instead of rough estimates.
Most capital projects are priced on assumptions. Then the change orders arrive.
Incomplete drawings, unverified site conditions, and optimistic budgets turn into cost overruns and disputes once the work is underway. The most expensive mistakes are the ones made before anyone breaks ground — when they’re still cheap to fix.
THE SOLUTION
We build a complete scoping package ready-to-ship to bidders. You get accurate quotes that won't change later.
As a General Contractor, we know what needs to be in a bid package to produce a solid price. We prepare a detailed scope package ready for builders to submit accurate estimates that won’t change later down the line.
WHAT'S INCLUDED — EVERY TIER
Line-item budget modeling
A full cost build categorized by CSI MasterFormat sections.
Digital asset risk scoping
Liabilities and unknowns flagged and documented up front.
Constructability review
We confirm the design can actually be built as drawn and take inventory of what’s missing.
Trade coordination matrix
Scope boundaries mapped so nothing is double-carried or missed.
Ready-to-bid scope of work
A standardized package you can put straight out to trades.
RFI register
Every documentation gap captured as a resolvable question.
HOW IT WORKS
01
Document intake
Plans, specs, and site data reviewed with zero assumptions
02
Predictive modeling
Cost and risk modeled against historical, project, and current market data.
03
Gap resolution
Unknowns raised as RFIs and closed before pricing locks.
04
Deliverable
Branded budget, risk map, and ready-to-bid scope handed off.
FIXED SCOPING PACKAGES
TIER 01
$1,500
Properties under 2,001 sq.ft. · flat fee
TIER 02
$2,500
2,001 – 3,500 sq.ft. · flat fee
TIER 03
Starting at $5,000+
3,500 – 10,000 sq.ft. · priced to scope
TIER 04
Request a Quote
Properties 10,000 sq.ft.+ · priced to scope
100% CREDIT The full scoping fee is credited back to the prime contract when DRAFT manages execution.